Njoftim per Tender – Sherbime konsulence projekti “Plani mbi investimin dhe zhvillimin e rrjetit per sektorin e Transmetimit te Energjise ne Shqiperi“

Country:

Tender No.: Submission Deadline:

Prequalification: Reference:

Project Executing Agency (PEA):

Financing: Project measures:

International Public Bidding (with Pre-qualification)

Albania

12302

Monday, 14th August 2017 (15:00 local time in Germany) Invitation for Expression of Interest

International open tender for Consulting Services for the Project “Transmission System Development and Investment Plan, Albania”

Operatori i Sistemit te Transmetimit (OST sh.a.) – Transmission System Operator (OST sh.a.) for the Albanian transmission system

KfW Development Bank
The project called comprises the following main tasks:

  • -  Data collection, site investigation and assessment of status and performance of the present transmission system. Reporting about the status of the current transmission system;

  • -  Albanian intern load forecast for the horizon year 2022, 2027 and 2032 and forecast of expected transit capacities for the same horizon years;

  • -  Assessment of adequacy of generation capacities from in particular renewable energy sources with focus on available small hydro, wind and solar power potential. Comparison with energy demand high winter and low summer seasons and recommendations;

  • -  Updating of the transmission system model from OST and SECI and performance of static and dynamic networks analysis of the present network and proposed future network configurations;

  • -  Elaboration of a network development strategy according to ENTSO-E guidelines covering renovation and extension and elaboration of an investment plan for proposed projects as well as scheduling and ranking of proposed projects;

  • -  Transmission tariff study for support to OST for application for transmission tariffs to the regulator to allow financing of network developments;

  • -  Support to OST for improvement of network operation procedures, regarding production scheduling including wind farms and development of contingency scenarios and related response procedures. Adequacy study, if the network control and operation is in line with ENTSO-E requirements;

  • -  Preparation of pre-feasibility studies for the three highest ranking projects including: Design parameters and design, cost estimate, financial and economic evaluation, abbreviated ESIA based on scoping level and abbreviated Resettlement Action Plan activities;

  • -  Workshops;

  • -  Reporting to OST and KfW.

Consulting Services (Energy Sector - Transmission Networks)

Albanian
Facebook
Instagram
YouTube